T-315 Central Avenue

This project was the replacement of an existing single span bridge (32) carrying Central Avenue (T-315) over Twomile Run in the Village of Ludlow with a new precast concrete arch. In addition, approximately 400 feet of roadway approach was reconstructed to improve the vertical alignment. The construction cost was approximately $485,000. A detour was utilized for this project.

 

TWE performed field survey, prepared base mapping, conducted traffic counts, developed right-of-way, roadway, and bridge plans, and conducted the initial NBIS inspection for this project. Erosion and sediment pollution control plans and a Hydrologic and Hydraulic Report were prepared to secure the necessary permits.

 

*Design 2004 and Initial NBIS Inspection 2006

Bridge Replacement

Consulting Engineers

T. W. ENGINEERING, INCORPORATED

CONSTRUCTION

Home

About Us

Projects

BEFORE

AFTER

Outdoor Advertising

Mon/Fayette

Ludlow T-315

NBIS Inspections

I-79 (Bridgeville)

Text Box: PA Turnpike

Contact Us

Text Box: Text Box: Careers
Text Box: